Blog

What is the last train for North East Line?

What is the last train for North East Line?

Last train timing on the North East Line from NE12CC13 Serangoon to NE1CC29 HarbourFront will be extended to 12:15am. Sengkang LRT services on the East and West Loop will be extended to depart Sengkang at 1:10am. Punggol LRT services on the East and West Loop will be extended to depart Punggol at 1:15am.

What time is last MRT?

First/Last train service terminating at NS1 EW24 Jurong East

First Train Last Train
Monday – Thursday 05:35 00:37
Friday 05:35 00:37
Saturday 05:35 00:37
Sunday 05:58 00:37

Is Downtown Line driverless?

The Downtown Line: The Game Changer. With the introduction of DTL3, the DTL is now 42-km long. This makes it the longest underground and driverless MRT line in Singapore.

What time is last Circle Line train?

The CIRCLE tube (Hammersmith – Edgware Road) has 7 stations departing from South Kensington and ending in Edgware Road Circle Line. CIRCLE tube timetable overview: Normally starts operating at 00:04 and ends at 23:50.

Is the MRT in Singapore 24 hours?

Train Operation Hours and Frequency 5.30am to around midnight daily. Operating hours are usually extended during festive periods.

How do I get to MRT from Marina Bay?

MRT Train Services Marina Bay Sands is linked directly to CE1/DT16 Bayfront Station on the Circle Line and Downtown Line of Singapore’s Mass Rapid Transit (MRT) train system. MRT services to/from Bayfront Station operate daily from (approximately) 6:00am to 12:00am midnight.

How do you get to Marina One the heart?

The nearest stations to Marina One-the Heart are:

  1. Downtown (DT17) is 250 meters away, 5 min walk.
  2. Central Blvd – Downtown Stn (03529) is 252 meters away, 5 min walk.
  3. Marina Bay Financial Centre Tower 1 is 385 meters away, 7 min walk.
  4. Asia Square Tower 1 is 460 meters away, 7 min walk.

Is the Downtown Line on the MRT system?

The Downtown Line is the fifth line to be introduced into the MRT system and is coloured blue on the system map. SBS Transit is currently operating this line. Designed as a medium capacity radial line, the Downtown Line boasts as the longest fully underground and automated rapid transit line in the world.

Which is the fifth MRT line in Singapore?

The Downtown Line (DTL) is Singapore’s fifth MRT line and a game changer for public transport in Singapore. DTL reaches out to residential areas such as Bukit Panjang, Bukit Timah, MacPherson and Bedok Reservoir that were previously not served by the MRT.

When does the Downtown Line Metro start operating?

DOWNTOWN LINE metro timetable overview: Normally starts operating at 05:36 and ends at 23:40. Normal operating days: everyday. Choose any of the DOWNTOWN LINE metro stations below to find updated real-time timetables and to see their route map. What time does the DOWNTOWN LINE metro start operating?

Where are the stops on the Downtown Line?

DOWNTOWN LINE Timetable and Stops The DOWNTOWN LINE metro (to ⑪ Bukit Panjang) has 34 stations departing from Expo (CG1|DT35) and ending in Bukit Panjang (BP6|DT1). DOWNTOWN LINE metro timetable overview: Normally starts operating at 05:36 and ends at 23:40. Normal operating days: everyday.