Trending

What is fai form?

What is fai form?

A first article inspection (FAI) is a design verification and design history file and a formal method of providing a reported measurement for each manufactured feature of a part or assembly. Typically the supplier performs the FAI and the purchaser reviews or approves the report.

What is included in an FAI?

A FAI report will typically contain the following documentation:

  • Design Records (Drawings, Bill of Material etc)
  • Raw Material Records.
  • A Ballooned Drawing.
  • Dimensional Inspection report.
  • Measurement System Traeability.
  • Special Processing Certs.
  • Functional Test Results.

What is fai industry?

First article inspection (FAI), a process shared across nearly every type of manufacturing industry in the world, allows suppliers to formally report measurements of the initial part manufactured in cooperation with a customer who reviews and approves it.

What is included in a first article inspection report?

What is a First Article Inspection Report? To validate that a product has been manufactured to the correct specification, First Article Inspection Report (FAIR) consists of 3 forms (form 1 Part number accountability, form 2 Product accountability and form 3 Characteristic accountability) plus 1 ballooned drawing.

What is the difference between FAI and PPAP?

PPAP (Production Part Approval Process) is a mandatory process in the automotive industry, and is designed to assess the manufacturability of the supplier to fulfill customer quality requirements. FAI (First Article Inspection) is the aerospace equivalent of the PPAP and is also called initial quality control.

How do you conduct an FAI?

Here’s how you can create a First Article Inspection Report in five steps.

  1. Step 1: Pre-plan your FAI. Before beginning, gather the documentation needed for your First Article Inspection:
  2. Step 2: Create an inspection plan.
  3. Step 3: Manufacture the part.
  4. Step 4: Collect data.
  5. Step 5: Create report.

What is a Delta FAI?

What is Delta FAI? A Delta FAI, or partial FAI, is done when there is a change in the manufacturing process. A partial or Delta FAI is required when: A change in design potentially affects form, fit, or function. A change in manufacturing source, process, inspection method, location of manufacture, tooling, or material.

What does FAI mean in food?

Food Allergy Initiative
The Food Allergy Initiative (FAI) is a 501(c)(3) non-profit organization founded in 1998 with the mission to fund food allergy research that seeks a cure, to improve diagnosis and treatment, and to keep patients safe through advocacy and education.

How do I fill out my first article inspection?

First Article Inspection (FAI) is the process of planning, manufacturing, and verifying a production process….How to Create a First Article Inspection Report in 5 Steps

  1. Step 1: Pre-plan your FAI.
  2. Step 2: Create an inspection plan.
  3. Step 3: Manufacture the part.
  4. Step 4: Collect data.
  5. Step 5: Create report.

How do I write my first article inspection?

What is an FAI injury?

Femoroacetabular impingement (FAI) is a condition in which extra bone grows along one or both of the bones that form the hip joint — giving the bones an irregular shape. Because they do not fit together perfectly, the bones rub against each other during movement.

How do you do FAI?

First Article Inspection (FAI) is the process of planning, manufacturing, and verifying a production process….Here’s how you can create a First Article Inspection Report in five steps.

  1. Step 1: Pre-plan your FAI.
  2. Step 2: Create an inspection plan.
  3. Step 3: Manufacture the part.
  4. Step 4: Collect data.

What do I need for a FAI report?

For example, every First Article Inspection report requires a dimensional record. Most require a Gage ID against each measurement. And a subset further requires a Calibration Due Date for each Gage ID. A FAI report will typically contain the following documentation:

What does a first article inspection ( FAI ) mean?

What is a First Article Inspection (FAI)? A First Article Inspection (FAI) is a business process that determines whether the manufacturing process for a part is capable of consistently delivering parts that conform to specifications.

What does FAI stand for in manufacturing category?

FAI involves selecting one part from the first batch/lot produced and verifying that the following major elements meet customers’ customer requirements:

How does a FAI evaluate a manufacturing process?

An FAI will typically evaluate one part with the important unwritten assumption that every subsequent part will follow the exact same manufacturing process, and the process will therefore consistently deliver good parts.